Sanmarco News

  • 1st-Jan-2013
    » launching a wide range of Digital.....
    Read More
  • 25-Jan-2013
    » Launching Sucessfully Double Charge & Mu
    Read More
  • 20-Feb-2013
    » A Wide Range Of full Polished Glaze porc
    Read More
  • 10-Aug-2013
    » First time in Foshan China Opening a Big
    Read More

Laying Instruction


1. Plaster the surface of the floor to be tiled with smooth finish and complete the plastering and curing at least two weeks prior to tiling.

2. Before fixing tiles, lay them out in desired pattern and make sure that they give acceptable blend of colour. Please not that certain amount of shade variation may occure in the tiles due to extreme firing temerature size variation up to ±0.75% and warpage upto ±0.5% of the dimention are allowed by all international standards of floor tiles. The COMPANY WILL NOT ACCEPT LIABILITY NCE TILES ARE FIXED.

3. Before fixing the tiles on the floor, we stronly recommend to randomly select tiles from different box & lay them in the desire pattern to make sure that the pattern so formed give you and acceptable blemd of color shade & size variation are inherent characteristic in manufacturing of ceramic tiles.

4. Kindly look for the arrow on the back of the tiles and follow the laying pattern as shown bellow diagram.
Please note that the company does not problem arising out of non adherence to the above fixing instructions.

 
We can Help You. Call Us + 91 99132 55888

Keep in touch with our news